#81862: "Contracts"
Hvad handler denne rapport om?
Hvad skete der? Vær venlig og vælg nedenunder
Hvad skete der? Vær venlig og vælg nedenunder
Vær sød at undersøge, om der allerede er sendt en besked om emnet
Hvis ja, venligst STEM for denne rapport. Rapporter med flest stemmer er dem der får PRIORITET!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Detaljeret beskrivelse
-
• Venligst kopier/indsæt fejlmeddelelsen du ser på din skærm, hvis der er en.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Venligst forklar hvad du ønsker at gøre, hvad du gjorde og hvad der skete
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken browser bruger du?
Google Chrome v109
-
• Venligst kopier/indsæt tekst vist på engelsk i stedet for dit sprog. Hvis du har et skærmbillede af denne fejl (god øvelse), kan du bruge Imgur.com til at uploade den og kopiere/indsætte linket her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• er der adgang til denne tekst i oversættelsessystem? Hvis ja, er det blevet oversat inden for 24 timer?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken browser bruger du?
Google Chrome v109
-
• Forklar venligst dit forslag præcist og sammenfattende, så det er så let som muligt at forstå, hvad du mener.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken browser bruger du?
Google Chrome v109
-
• Hvad blev der vist på skærmen, da du blev blokeret (Blank skærm? Noget af spilbrugerfladen? Fejlmeddelelse?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken browser bruger du?
Google Chrome v109
-
• Hvilken del af reglerne blev ikke respekteret ved BGA-tilpasningen
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Er regel-brudddet synligt i e
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken browser bruger du?
Google Chrome v109
-
• Hvad var den spilhandling du ønskede at udføre?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Hvad forsøgte du at gøre for at udløse denne spilhandling?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Hvad skete der, da du forsøgre at gøre dette (fejlmeddelelse, meddelelsesstatusbjælke, ...)?
• Hvilken browser bruger du?
Google Chrome v109
-
• I hvilket stadie af spillet opstod problemet (hvad var den daværende spilinstruktion)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Hvad skete der, da du forsøgte at udføre denne spilhandling (fejlmeddelelse, meddelelsesstatusbjælke, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken browser bruger du?
Google Chrome v109
-
• Venligst beskriv display problemet. Hvis du har et skærmbillede af denne fejl (god øvelse), kan du bruge Imgur.com til at uploade den og kopiere/indsætte linket her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken browser bruger du?
Google Chrome v109
-
• Venligst kopier/indsæt tekst vist på engelsk i stedet for dit sprog. Hvis du har et skærmbillede af denne fejl (god øvelse), kan du bruge Imgur.com til at uploade den og kopiere/indsætte linket her.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• er der adgang til denne tekst i oversættelsessystem? Hvis ja, er det blevet oversat inden for 24 timer?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Hvilken browser bruger du?
Google Chrome v109
-
• Forklar venligst dit forslag præcist og sammenfattende, så det er så let som muligt at forstå, hvad du mener.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Hvilken browser bruger du?
Google Chrome v109
Rapporthistorik
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Tilføj noget til denne rapport
- Et andet bord-ID / træk ID
- Løste F5 problemet?
- Skete problemet flere gange? Hver gang? Tilfældigt?
- Hvis du har et skærmbillede af denne fejl (god øvelse), kan du bruge Imgur.com til at uploade den og kopiere/indsætte linket her.
